Bekijk de vacatures

VB is moving

On March 20th we made a start on the construction of our new office in Naaldwijk, which is just as the crow flies 500 meter from our present office. We didn't make this start by hitting the traditional 'first pile’, but by planting eight beautiful oaks on the entrance side of our plot. 


Trees represent growth and growth is the reason why we want to move to this new location. At the same time, with these trees we also like to give something back to the environment. We made this symbolic start together with our employees and their children, because we like to let them contribute to what we want to achieve together: a sustainable future for this and coming generations.

 

Since the start of the construction of our new building, updates have gone fast. In the meantime, the groundworks and foundation have been completed. The walls and steel construction are taking shape and the contours of the building are already visible!

Take a look at the pictures and video's below for an impression!

912e3f18 e459 4c5a 8ea0 64af7c02882baf6649a6 eb5b 458b b0dd b88961ff065cd76b5979 7b29 4544 bc9c 2a7cf76a791b